- 'Dining area catch-up', got rid of the soil pipe 'feature' by moving the bathroom around, plasterboard and get plastered
- 'Underfloor heating', lots of prep work but the pipes went in really easy (must be a problem)
- 'Door, cupboard and flue', inside half of the doorway to the side extension, manifold cupboard and boiler flue