Trev & Mills
Home
World Trip Diary
House Renovation Diary
← House Renovation
Old Lounge and Hall
screed in hall chipped up to make way for underfloor heating
same in old lounge and collapsed section of floor dug out and re-concreted
polythene down in hall
and lounge - looks like a paddling pool
starting to lay the battens
this is taking too long.. fortunately dads helping out tomorrow!
I've always been a tidy worker
insulation and pipes start to go down
followed by heat conducting sheets
then polythene and chipboard
all done in the hall, just needs the laminate down
and the lounge.. put back into some form of order